Polyurethane Waterproofing at Depo Construction of LRT Jakarta Corridor 1 (Phase 1) Kelapa Gading - Velodrome

Jul 20, 2019 Waterproofing & Waterstop
Period : May 17, 2018 –March 29, 2019
Contractor : Cipta Rupa Pertama, PT, Multi Karya Engineering, PT & TeknikoIndonesia, PT
Owner : Hyundai Engineering Co. Ltd
Product : Cebex100, Nitocote AC, NitobondEC, Conbextra EP10TG (FOSROC), Sikafloor®-81
EpoCem® New HC (Sika), CYH 500, CYH-202, PM-3 & EPL-550;
polyurethane-polyureahybrid spray coating system (JTCC)

Explore Topics


Featured Category

Showing posts from the first available category only.

← Back to Blog

Polyurethane Waterproofing at Depo Construction of LRT Jakarta Corridor 1 (Phase 1) Kelapa Gading - Velodrome

Jul 20, 2019 Waterproofing & Waterstop
Period : May 17, 2018 –March 29, 2019
Contractor : Cipta Rupa Pertama, PT, Multi Karya Engineering, PT & TeknikoIndonesia, PT
Owner : Hyundai Engineering Co. Ltd
Product : Cebex100, Nitocote AC, NitobondEC, Conbextra EP10TG (FOSROC), Sikafloor®-81
EpoCem® New HC (Sika), CYH 500, CYH-202, PM-3 & EPL-550;
polyurethane-polyureahybrid spray coating system (JTCC)